Client to save £1m a year in energy costs

An injection moulding company in the North East had expanded operations into a new 3,000sq ft factory, but there was insufficient power to run the manufacturing facility.

We were contacted at short notice to design and install a 2MW combined heat and power system, which involved a 400-metre extension of the existing gas main.

Four, 500 kW CHPs were specified to meet existing and future power requirements, which were delivered within 16 weeks from the order being placed.

They are now providing low cost, low CO2 electricity and the new system will save the client over £1m a year in energy costs.